Abstract
This chapter examines the project planning specifications for an off-grid water desalination critical infrastructure project in Metropolitan Lagos, Nigeria taking into cognisance the State’s critical infrastructure planning limitations. Technological, financial and socio-economic data for the water desalination project were obtained and the Technology Foresight Analysis (TFA) methodology was used for analysis. The results determined a 100 million litres a day (MLD) water desalination plant design requiring an initial investment of N 70.82 billion. Estimated levelized cost of desalinated water was N 0.89 per Litre of water. With an assumed retail price of N 1.00 per Litre of water, annual revenue and profits were estimated at N 24.13 and 3.638 billion respectively. Profitability indices showed Net Present Values of N 16.15 billion, break-even time of 1 year, payback period of 13 to 20 years, and Return on Investment of 122.8% over the 25-year life span of the project. Socioeconomic benefits were determined to be a regular supply of desalinated water provided at a quarter of the extant price charged by water vendors supplying the area and having a daily cost savings of N 100.56 – 201.12 million (N 36.72 – 73.42 billion annually). The study concluded that an off-grid water desalination infrastructure project for the area would be technically feasible, economically viable, and socioeconomically worthwhile, and recommended same as adequate and appropriate to be deployed as a strategic municipal water supply alternative for Metropolitan Lagos, Nigeria.
Suggested citation
Ibikunle Ogundari
(2024). Project Planning Analysis for Off-grid Municipal Water Desalination Critical Infrastructure Project Development in Metropolitan Lagos, NigeriaKooxakar Festschrift, 1(1).
https://doi.org/10.69798/k6137486
Metric
-
Download Link
-
Issue
Vol. 1 No. 1 (2024): Kooxakar Festschrift
-
Published
03-06-24
-
Keywords
Desalinated water Critical infrastructure Technology foresight analysis (TFA) Project planning and management Metropolitan Lagos Nigeria